Cocode Blog
记录开发与交接中
学到的经验
-
Six things a project handover should include
-
Three checks before shipping AI-assisted code
-
Why starting with a design system speeds up screens
-
What to check in an estimate before the total
-
How many button states does an interface need?
-
Sharing push notification logic between apps
-
Five common app store review setbacks
-
Deciding what an empty screen should show
-
Separating admin tasks with roles
-
What to include with a weekly test build
-
Four neutral levels for dark mode
-
Payment states to agree on before integration
-
Common first-month questions after handover
-
Before drawing a new icon
-
A design review that reduced screen count
-
Why incident contacts belong in the agreement
-
Three ways to present tables on phones
这是用于设计评审的示例文章,发布前会审核内容。
寻找一起打造产品的人
工作方式和福利可以在招聘页面查看。
查看招聘